    New Hampshire Thermal REC Metering Requirements for Geothermal

    November 23, 2026 Emergent Energy

    New Hampshire pays for useful thermal energy through its Class I Thermal requirement, and supply is short: in 2024 only 30% of the thermal obligation was met with credits, and utilities paid the alternative compliance payment for the rest. How a geothermal system is measured depends on one number, its combined heating capacity, with the line drawn at 1,000,000 Btu per hour.

    Up to 1,000,000 Btu/hr: run time instead of a heat meter

    Small thermal sources can use a formula in the state's rules (Puc 2506.04(i)). For each heat pump, output equals its AHRI-certified heating capacity at part load, multiplied by its certified coefficient of performance minus one, multiplied by its run time in heating mode, divided by the coefficient of performance. What has to be recorded is each heat pump's heating run time. This method counts heating only. A small system may instead install heat meters, which also captures cooling. The Department of Energy began rulemaking in 2025 on measurement methods for small systems, so this may change.

    Over 1,000,000 Btu/hr: ground-loop heat meters

    Large systems must meter the ground loop: flow near the loop outlet, and temperature at the loop inlet and outlet, with sensors as close to the loop as practical. Bleed points, supplemental boilers and cooling towers are left out of the calculation. Readings are taken at least every hour and totalled daily, monthly and quarterly. The meters must either meet the accuracy of European Standard EN 1434, with the highest-class flow meter that covers the design flow and a temperature sensor pair of Class 5K or better, or carry a manufacturer's guaranteed accuracy of 5% or better. Either way, a New Hampshire licensed professional engineer confirms the installation.

    Deductions that reduce credits

    Large geothermal systems have 3.6% of measured output deducted for pumping energy and losses. Meters that do not meet EN 1434 accuracy add a second deduction equal to their guaranteed accuracy, so a 5% meter costs another 5% of credits for the life of the system. Spending more on an EN 1434 meter can pay for itself through credits that are not discounted. Geothermal loops often run below freezing with antifreeze in winter, so the meter and its temperature sensors also need to be rated for the loop's coldest temperature and set up for the antifreeze mix.

    The independent monitor

    Every thermal source must retain an independent monitor certified by the state. The monitor inspects the meters once, then verifies output and reports it to NEPOOL-GIS every quarter. For geothermal systems the monitor can be a New Hampshire licensed professional engineer, a certified energy manager, a BPI building analyst, a RESNET home energy rater, or an IGSHPA Accredited Geothermal Installer. The monitor cannot be the owner, a family member, an employee of the facility, or the company aggregating the credits, and cannot be paid per credit.

    Getting the metering right

    Emergent Energy can deliver the metering as part of the registration: meters specified to the state's rule, then sourced, installed, commissioned and monitored under one contract. Hardware may come from Emergent Metering, a related company under common ownership, or from another manufacturer when the state's accuracy standard calls for it. Emergent Energy confirms which method applies before anything is bought. Because New Hampshire bars aggregators from monitoring the systems they aggregate, Emergent Energy installs and commissions the meters but always uses a separate certified monitor. See the /new-hampshire page for the full program, or start at /evaluate.