Virginia Geothermal Credit Metering Requirements by System Size
Virginia's geothermal carve-out starts with compliance year 2027, and the Virginia State Corporation Commission has set how a system's heating and cooling output is counted. Its GATS Business Rules (Revision 6, effective 1 October 2026) sort systems into three size classes for 2026 through 2030. Whether a meter is needed depends entirely on which class a system falls in. One ton of capacity is 12,000 Btu per hour.
Up to 50 tons: no meter
Class 1 covers systems up to 50 tons, which includes almost every home and many small commercial buildings. No meter is required. Credits are calculated from the building's conditioned square footage (at 750 square feet per ton), heating and cooling degree days from the nearest NOAA weather station, and the equipment's efficiency from its AHRI Certificate of Product Rating. The owner's affidavit lists the address, installation date, installer and permit number, AHRI reference number, NOAA reference location, conditioned square footage, building type, and whether the system provides heating, cooling and water heating.
Over 50 to 284 tons: an electric meter and a water temperature sensor
Class 2 covers light commercial systems. These need a revenue-quality electric meter on the grid power feeding the heat pumps and ground-loop circulating pumps, and a temperature sensor on the water entering the heat pumps. Both feed a data acquisition system. Heating credits equal the metered electricity multiplied by the heat pumps' certified coefficient of performance minus one, split by the year's share of heating degree days; cooling credits use the certified energy efficiency ratio and the share of cooling degree days. The SCC expects revenue-quality meters to meet the ANSI C12 accuracy standard. The affidavit attaches the AHRI certificate and the coefficient of performance table.
Over 284 tons: heat meters
Class 3 covers large commercial and industrial systems, and there is no formula. Output is measured directly with revenue-quality thermal meters accurate to within 0.5% of true value at full load. The affidavit attaches annotated product literature for all major equipment and for the meters, and converts heat to credits at 3.413 MMBtu per MWh. A 0.5% accuracy requirement rules out many common heat meters, so the meter has to be chosen against that number before it is ordered.
Reporting and who signs
Output is reported to PJM-GATS monthly under the geothermal fuel code. The system owner signs a self-certification affidavit on the SCC's form for the system's class, and it goes at the same time to the PJM-GATS administrator and to SCC Staff. Systems of 1 MW or less are registered as small distributed resources, and qualifying low-income projects carry their own designation. Credits can be used for compliance in the year they were generated or the following five years, then sold into Dominion Energy Virginia's and Appalachian Power's quarterly requests for proposals.
Getting the metering right
For a Class 2 or Class 3 system the meter is what makes the credits possible, so it pays to plan it with the mechanical design rather than add it afterwards. Emergent Energy can deliver the metering as part of the registration: meters specified to the state's rule, then sourced, installed, commissioned and monitored under one contract. Hardware may come from Emergent Metering, a related company under common ownership, or from another manufacturer when the state's accuracy standard calls for it. Emergent Energy confirms which method applies before anything is bought. See the /virginia page for the full program, or start at /evaluate.